نموذج تقييم المخاطر
Risk Assessment.
Team Members:
Date
Subject: -
Step
|
What Can Go Wrong?
|
What Would Happen if it Did?
|
Risk Evaluation
|
What Can I do to Prevent This?
|
Residual Risk
|
||||
|
|
|
P
|
S
|
RR
|
|
P
|
S
|
RR
|
1
|
Change
for any condition of the working plan or procedure
|
Injury-damage equipment -
|
L
|
H
|
10
|
1.Pre-job
safety meeting must be done
2.Stop the work for consultation with the supervisor and HSE 3.The radios must be
with the operators during the work
|
L
|
L
|
2
|
2
|
Simops
|
Personal injury
|
M
|
M
|
8
|
ALL NON ESENTIAL PERSONNEL TO BE KEPTAWAY
Barriers and signs to be
erected
|
L
|
L
|
2
|
3
|
Incorrect / improper hand
tools
|
Personal injury
|
M
|
H
|
12
|
All tools inspected prior
to use and in good condition
Use correct tools for the
job
Competent people and
correct ppe
|
L
|
L
|
2
|
4
|
Falling
because off: -
- Person Diabetic Coma
|
Injury or Fatality
|
L
|
H
|
10
|
Medical checking before
work.
|
L
|
L
|
2
|
5
|
Covering people with
chemical material
|
Personal injury
|
L
|
M
|
4
|
Wearing the proper PPE,
Preparing washing
equipment.
|
L
|
L
|
2
|
6
|
Emergency case
|
Personal injury
|
L
|
M
|
4
|
- Awareness of emergency response.
- Pre-job safety meeting
must be done before the work
-Stop work in emergency
situation and report to area manager.
|
L
|
L
|
2
|
7
|
Falling object during lift
|
Injury
|
M
|
M
|
8
|
Use proper certified crane
Good communication
Use proper certified wire
|
L
|
L
|
2
|
8
|
Person
looses balance
|
Injury or Fatality
|
L
|
H
|
10
|
-Using full body harness
with fall
arrest equipment.
- All persons required to
use fall arrest equipment should be trained in its use, and be familiar with
this Procedure.
|
L
|
L
|
2
|
9
|
Person looses balance while
climbing
|
Falling and death
|
H
|
VH
|
15
|
-using full body harness with 2 hooks 1 hanged while
moving the other one
|
L
|
L
|
2
|
10
|
Bad
Communication
|
Delay or Interrupt
Operation
|
L
|
M
|
4
|
Radio with Operators During
working
|
L
|
L
|
2
|