نموذج تقييم المخاطر


 Risk Assessment.


Team Members:
                             

Date

Subject: -


Step
What Can Go Wrong?
What Would Happen if it Did?

Risk Evaluation

What Can I do to Prevent This?
Residual Risk



P
S
RR

P
S
RR
1
Change for any condition of the working plan or procedure
Injury-damage equipment -

L

H
10
1.Pre-job safety meeting must be done                                         2.Stop the work for consultation with the supervisor and HSE                        3.The radios must be with the operators during the work
L
L
2
2
Simops
 Personal injury
M
M
8
 ALL NON ESENTIAL PERSONNEL TO BE KEPTAWAY
Barriers and signs to be erected
L
  2
3
Incorrect / improper hand tools
 Personal injury
M
H
12
All tools inspected prior to use and in good condition
Use correct tools for the job
Competent people and correct ppe

 L
 L
 2
4



Falling because off: -
-  Person Diabetic Coma
Injury or Fatality
L
H
10

Medical checking before work.
L
L
2
5
Covering people with chemical material
Personal injury
L
M
4
Wearing the proper PPE,
Preparing washing equipment.
L
L
2
6
Emergency case
Personal injury
L
M
4
- Awareness of emergency response.
- Pre-job safety meeting must be done before the work
-Stop work in emergency situation and report to area manager.
L
L
2
7
Falling object during lift
Injury
M
M
8
Use proper certified crane
Good communication
Use proper certified wire
L
L
2
8
Person looses balance
Injury or Fatality
L
H
10
-Using full body harness with fall arrest equipment.
- All persons required to use fall arrest equipment should be trained in its use, and be familiar with this Procedure.
L
L
2
9
Person looses balance while climbing
Falling and death
H
VH
15
-using full body harness with 2 hooks 1 hanged while moving the other one
L
L
2
10
Bad Communication
Delay or Interrupt Operation

L

M
4
Radio with Operators During working
L
L
2