mobilizing Risk Assessment نموذج تقييم المخاطر (سجل المخاطر)

mobilizing Risk Assessment نموذج تقييم المخاطر (سجل المخاطر)
Risk Assessment: Activity –mobilization

Task
Hazards
Persons at Risk
Unmitigated
Risk
Proposed Mitigation Measures
Mitigated
Risk
L
S
R
L
S
R
mobilization

Falling Hazard

mobilization
 Team
4
5
20
·         All skilled labor will use full body harness and 100% tie off and fixed point.
·         Only skilled labor will be allowed to work at height.
·         All skilled labor will use fall arrestor system.
`.
2
4
8
Falling objects

Labours
3
5
15
·         A skilled watcher will be existing.
·         Hard barrier to be installed, signs and PPE.

1
4
4
Electric shock
mobilization
      Team
3
4
12
·         Disconnect all Power Sources.
·         LOCK OUT TAG OUT procedure will be applied.
·         Wearing PPE against electric shock prior to commencing work
·         All used equipments are properly grounded and daily checked
1
4
4
Dust inhalation

Labours
4
2
8
·         All labour will Use dust mask.
·         Dust control procedure will be applied.
2
2
4
Releasing steel rebar & wood
Material handling
mobilization
 Team
3
4
12
·         The material handling will be done in correct method, Controlled by authorised personnel.
2
4
8
Waste materials.
Tripping Hazard

Labours
5
3
15
·         Housekeeping will be done immediately as soon as possible.
·          All nails to be removed from lumbers assemblies.
2
3
6

Install mobilized material
Crush hazard, Equipment movement & Trucks.

Labours
3
5
15
·         Barricades will be applied around working area &signs.
·         Flag man will be exist.
2
4
8
Dust inhalation

Labours
4
2
8
·         All labour will Use dust mask.
·         Dust control procedure will be applied.
·         Equipments &trucks to be equipped with back alarm
2
2
4

Cutting Rebars
Burns, Fire.
Welders/Operational Team.
4
4
16
·         All equipment to be checked and colour coded.
·         Equipment to be correctly earthed.
·         Cutting work to be controlled with hot work permit.
·         PPE
·         Fire extinguishers will be available
2
4
8

Removal of scrap
Equipments &Trucks

Labours
3
4
12
·         Controlled removal of spoils” banks man “.
·         One way system of traffic wherever possible.
·         Signs and signals to be established to control traffic movement.
·         All vehicles will be parked uniformly and in a suitable parking area
·         Parking area will be provided by sheds from the sun
·         Arrange a suitable place for fuel tanks, chemical tanks and other active materials containers away from other facilities.
·         Arrange chemical powder fire extinguishers.
2
4
8
Night work
Slips, trips, falls and vehicle collisions.

Workers
3
4
12
·         Carry out work in accordance with attached Night Work JHA.
·         Lightening will be provided
2
4
8
mobilize  the ground floor
Noisy

Labours
5
2
10
·         All labour will use ear muff.
2
3
6
L (Likelihood)    X       S (Severity)        =       R (Risk)
If MITIGATED RISK = UNMITIGATED RISK contact Safety Manager
1 ~ 5                    X       1 ~ 5           =       1 ~ 25

Workforce to be briefed with findings before work



Remark: all Labours will wear PPE (hard hat, safety glasses, safety shoes, gloves, Dust mask)

1 -8                  Low Risk – Work can commence
9 -12                Medium Risk – Reduce risk further or increase supervision
12 – 25            High Risk – Must be mitigated