ٌٌRisk assessment project مشروع تقييم المخاطر
Introduction
As part of the Managing safely course, you have to
complete a project and have it assessed. You’ll be expected to carry out a risk
assessment based on your own work environment. You will need to record the risk
assessment on either your company’s designated form or the one provided by the
trainer. Do not submit any additional material in support of your project work.
You can complete the project either by hand writing or typing it onto a printed
copy.
Before returning your
project, check that it is fully completed including your name, date and
signature. This project must be your own
work.
When you’ve completed your
work, you should return it to your training provider by the date they have advised.
Managing safely - project
Instructions
Please read all the instructions before starting work on your project.
The risk assessment project
is broken down into a number of stages, which should flow from start to finish,
telling a complete story of your work
area and the hazards, risks and their required controls within it.
Your trainer has advised you of the risk assessment form to use for this
process.
For this risk assessment project, it is important that you only choose
hazards that are not currently adequately controlled.
Your risk assessment must
show the following about your work area:
• A brief
description of the work area being assessed
• A brief
description of the tasks being performed in the work area
• A
listing of four (4) hazards in the work area, with each one followed through
the risk assessment process
• List who may be
harmed by the hazard
• State how they
may be harmed
• Describe the
risk controls already in place
• Calculate
a risk rating – using the IOSH 5 x 5 matrix or an appropriate company-specific
system
• Describe any
additonal controls needed
• Calculate a
risk rating for the new controls (the residual risk)
• State who will
action or monitor any further controls
• State when the
actions or monitoring needs to take place
In addition it must also show the following basic
information:
• Your name
• Date and time
of the risk assessment
• Your training
provider’s name
• Your signature
• The risk
assessment review date
If you are using the IOSH
risk assessment project template, we recommend that you use:
• the 5 x 5 risk
rating calculator
• the action
level table – for further controls
If you are using your own company risk
assessment form for the project, we recommend that you provide a copy (to the
trainer) of
• the risk rating
guidance.
Risk assessment form
Name of assessor
|
|
|
|
Date
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
Time
|
|
|
|
|
|
Work area
|
|
|
|
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
Task being assessed
|
|
|
|||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
How
might
|
|
Existing
|
Risk
rating
|
|
New
risk
|
Action/
|
Action/
|
||||||||||||||
What is the
|
Who might be
|
|
Additional
|
|
rating
|
||||||||||||||||||||
people
be
|
|
risk
control
|
|
monitored
by
|
monitored
by
|
||||||||||||||||||||
hazard?
|
|
harmed?
|
|
|
|
|
|
|
controls
|
(Residual)
|
|||||||||||||||
|
harmed?
|
|
measures
|
|
|
|
|
|
whom?
|
when?
|
|||||||||||||||
|
|
|
|
|
L
|
C
|
R
|
|
L
|
C
|
R
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
Risk assessment form
|
|
How might
|
Existing
|
Risk rating
|
|
New
risk
|
Action/
|
Action/
|
|||||
What
is the
|
Who
might be
|
Additional
|
rating
|
||||||||||
people be
|
risk
control
|
monitored
by
|
monitored
by
|
||||||||||
hazard?
|
harmed?
|
|
|
|
controls
|
(Residual)
|
|||||||
harmed?
|
measures
|
|
|
|
whom?
|
when?
|
|||||||
|
|
L
|
C
|
R
|
|
L
|
C
|
R
|
|||||
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Review date
|
|
Signature
|
|
|
|
|
|
Training Provider name RRC