اعلان 728 × 90

اخر الأخبار

ٌٌRisk assessment project مشروع تقييم المخاطر


Managing safely - project - delegate guidance




Introduction

As part of the Managing safely course, you have to complete a project and have it assessed. You’ll be expected to carry out a risk assessment based on your own work environment. You will need to record the risk assessment on either your company’s designated form or the one provided by the trainer. Do not submit any additional material in support of your project work. You can complete the project either by hand writing or typing it onto a printed copy.

Before returning your project, check that it is fully completed including your name, date and signature. This project must be your own work.

When you’ve completed your work, you should return it to your training provider by the date they have advised.

Managing safely - project




Instructions

Please read all the instructions before starting work on your project.

The risk assessment project is broken down into a number of stages, which should flow from start to finish, telling a complete story of your work area and the hazards, risks and their required controls within it.

Your trainer has advised you of the risk assessment form to use for this process.

For this risk assessment project, it is important that you only choose hazards that are not currently adequately controlled.

Your risk assessment must show the following about your work area:

      A brief description of the work area being assessed

      A brief description of the tasks being performed in the work area

      A listing of four (4) hazards in the work area, with each one followed through the risk assessment process

       List who may be harmed by the hazard

       State how they may be harmed

       Describe the risk controls already in place

       Calculate a risk rating – using the IOSH 5 x 5 matrix or an appropriate company-specific system

       Describe any additonal controls needed

       Calculate a risk rating for the new controls (the residual risk)

       State who will action or monitor any further controls

       State when the actions or monitoring needs to take place

In addition it must also show the following basic information:

      Your name

      Date and time of the risk assessment

      Your training provider’s name

      Your signature

      The risk assessment review date

If you are using the IOSH risk assessment project template, we recommend that you use:

      the 5 x 5 risk rating calculator

      the action level table – for further controls

If you are using your own company risk assessment form for the project, we recommend that you provide a copy (to the trainer) of

      the risk rating guidance.

Risk assessment form



Name of assessor



Date






































Time





Work area







































Task being assessed










































How might

Existing
Risk rating

New risk
Action/
Action/

What is the
Who might be

Additional

rating

people be

risk control

monitored by
monitored by

hazard?

harmed?






controls
(Residual)


harmed?

measures





whom?
when?






L
C
R

L
C
R



















































Risk assessment form






How might
Existing
Risk rating

New risk
Action/
Action/
What is the
Who might be
Additional
rating
people be
risk control
monitored by
monitored by
hazard?
harmed?



controls
(Residual)
harmed?
measures



whom?
when?


L
C
R

L
C
R



































Review date
   
Signature






Training Provider name           RRC

ليست هناك تعليقات