                                                                   Risk Assessment

Subject: -   18” Suction Line To Associated Gas Compressor 1861/62 Leaking Under Ground. 


Step
What Can Go Wrong?

What Would Happen if it Did?

Risk Evaluation

What Can I Do to Prevent This?

Residual Risk

P
S
R.R
P
S
R.R
1
Gas leak increasing.
    ·  Fire 
    ·  Explosion
    ·  Blow Out
H
M
9
    ·  Gas Monitoring on Site
    ·  Gas Leak Area Has To Be Isolated From Any Source Of Ignitions.   
M
L
6
2
Gas pockets accumulated under ground due to continuos gas leaks.  
   ·    Fire
   ·    Explosion
   ·    People Injury
   ·    Damage Of Equipment 

M

M
8
    ·  Flow-up gas monitoring
    ·  Shutdown when we need it
    ·  Keep in eye looking for gas leaks spots.   
L
L
2
3
Long stopping of gas associated
   ·    Production losses

H

M
9
    ·  Gas leak control in place to avoid serious loss.
    ·  Prepare plan to reduce risk to lowest level.
    ·  Emergency response has to be known just in case 
M
L
6
 Evaluation and prioritisation of risk
                ·   Monitor procedures and controls to ensure risk is maintained as low as reasonably practical take immediate action to ensure additional controls implemented within certain time ( E.g. one month ).

Team Members

    1.      Eng. Fawzy Asser                         RZK Ass. Gen.Mgr.
    2.      Mr.   Salah Alsemairy                    W/D Shipping
    3.      Eng. Saad Metwally                      WD Maint.
    4.      Eng. Fathy Fikry                           WD const.
    5.      Eng. ASHRAF MAH. A/AZIZ            WD HSE
    6.      Mr. Hossen Mohamed                    RZK HSE
                                                                   Risk Assessment

Subject: - WEBCO B.J. pump engine replacement by another engine of RZK St. # 7 cat diesel generator


Step
What Can Go Wrong?

What Would Happen if it Did?

Risk Evaluation

What Can I Do to Prevent This?

Residual Risk

P
S
R.R
P
S
R.R
1
PPE NOT USED.
    ·  INJURY
L
H
10
    ·  PPE MUST PUT ON IN WORKING SITE.   
L
L
2
2
INCORRECT LIFTING
   ·    INJURY
   ·    EQUIP. DAMAGE

L

H
10
    ·  USE CERTIFIED SLINGS  AND TAGED WIRES
    ·  PROPER PPE AND GOOD SUPERVISION.
L

L
2
3
ELECT.HAZ.
   ·    ELECT.SHOCK

L

M
4
    ·  DISCONNECT.AND TAG OUT ELECT.SOURCE
L
L
2
4
TOOLS FALLING
   ·    PEOPLE INJURY

M

M
8
    ·  WEARING SAFETY GEARS AND USING GOOD TOOLS
L
L
2
5
WELDING 
   ·    INJURY
   ·    FIRE

L

VH
11
    ·  WELDING M/C HAS TO BE IN GOOD CONDITION AND FLAME ARRESTERED
    ·  GOOD AND CLEANED WORKING AREA   
L
L
2

Risk Assessment

Team Members                                                                                                   Date:  19   / 1    /2003

1.   Fawzy Assar                          5. Ahmed Elsharkawey
2.   Salah El Semeiry                    6. Mahmoud A/Elhaliem
3.   Ahmed Yehia                         7. Asharf Mah. A/Elaziz
4.   Abd Elnaiem Hassan                                                                           

Subject: - Using rags with open flame to light the flare tip at Rzk area.

Step
What Can Go Wrong?

What would happen if it did?

Risk Evaluation

What Can I Do to Prevent This?

Residual Risk

P
S
R.R
P
S
R.R
1
Gas packets/clouds accumulated on ground or around the flare due to continua’s vent gas
-          Fire
-          Explosion
-          People injury or Burning
-          Facilities damage.

H

H
13
1)    Never use rags to light the flare. But, use proper gun to do it.
2)    Study installing the automatic ignition system
3)    Mark the area around the flare and use sign to show that it is hazard.
4)    Hazard entry permit is required
5)    When approaching the flare area, use gas monitor to measure the level 
6)    Radio is must for quick communication in case of emergency.
7)    Prepare “ Emergency Procedures” in case of flare problems.
L
L
2
Remarks:-

Ø P   = Probability    

Ø S   = Severity     
Ø R.R= Risk Rating

Risk Assessment

Team Members                                                                                                   Date:  25   / 2    /2003

1.Aly Sliman                               5.Housan Ahmed  
2.Mahmoud A/Elrazek               
3.Ahmed Yehia                        
4.Asharf Mah. A/Elaziz                                                                            

Subject: - Remove well 16-control valve.

Step
What Can Go Wrong?

What would happen if it did?

Risk Evaluation

What Can I Do to Prevent This?

Residual Risk

P
S
R.R
P
S
R.R
1











2
Gas leakage due to bad isolations.










Fall the control during lifting operation. 
-          Fire
-          Explosion
-          People injury or Burning
-          Facilities damage.








-          Facilities damage.
-          People injury

M















M

H











H

12











12

1.  Positive isolation upstream and downstream the control (isolation certificate).
2.  Release the pressure after isolation.
3.  Using copper hammer and PPE.
4.  Car parking out side the well about 50 m.  
5.  Radio is must for quick communication in case of emergency.
1.   The crane & shackles and slings should be certified.
2.   No body walking under the load.
3.   Housekeeping the area before the work.    
L
L
2
Remarks:-

Ø P   = Probability    

Ø S   = Severity     
R.R= Risk Rating