HAZARD IDENTIFICATION AND RISK CONTROL نموذج تقييم المخاطر


HAZARD IDENTIFICATION AND RISK CONTROL  نموذج تقييم المخاطر

HAZARD IDENTIFICATION AND RISK CONTROL
 

Job Title :( (العمل …………………………………………………………………………………….. Location: Water electrical heater

Reported By :( تم بمعرفة)……………………………… …..…Dept. :( الادارة) ………….………  Day/Date: ………………………………………...…

Acceptable
Residual Risk
Done By
Method(s) of control
Risk Evaluation
Hazard Effect(s)
Potential Hazardous Task(s)
N
Y
R.V
S
P
R.V
S
P

Y
16
8
2
Electrical dept.
Periodical check on the electrical and isolation systems of the heater
(At least monthly).
48
8
6
Single fatality
Electrical hazards (failure of the isolation system )

Y
20
10
2
Inst. dept.
Periodical check on the temperature control system of the heater
(At least monthly).
60
10
6
Multiple fatality 
Explosion hazards (failure of the temperature control system)

Y
12
6
2
Static dept.
Periodical check on the non return valve of the heater.
(At least every 3 months)
36
6
6
Major injury 
Burning hazards (deformation of the seal of the non  return valve )

We have considered the need for engineering change and /or processes shut down before this task is carried out. We believe, however, that the measures we have specified are adequate to reduce the overall risk to an acceptable level without further safeguards, and we recommended that work should proceed.
We are not satisfied with the safeguards available to control risk and we recommend that this task should not proceed until further risk control measure can be developed.

Conclusion/Comments: ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
Name: …………………………   Signature: ……………………..                                                                                                                                         Reviewed by HSE dept.
                                                                                                                                                                                                                                                   Name: ……………………….
P: probability   S: severity    R.V: Risk value                                                                                                                                                                          Signature: ……………………
R.V= S xP                                                                                                                                                                                                                                Date: …………………………
                                                                                                              