Job Title :( (العمل …………………………………………………………………………………….. Location: water cooler   

Reported By :( تم بمعرفة)……………………………… …..…Dept. :( الادارة) ………….………  Day/Date: ………………………………………...…

Acceptable
Residual Risk
Done By
Method(s) of control
Risk Evaluation
Hazard Effect(s)
Potential Hazardous Task(s)
N
Y
R.V
S
P
R.V
S
P

Y
16
8
2
Electrical dept.
Periodical check on the electrical and wiring system of the heater
(At least monthly).
48
8
6
Single fatality
Electrical hazards (failure of the isolation of the power cable )

Y
12
6
2
Administration
Periodical analysis of the drinking water
Usage of filter
40
10
4
Multiple fatality
Biological hazards

Y
4
2
2
Administration
Periodical cleaning of the water cooler area
36
6
6
Serious injure
Sliding hazards

We have considered the need for engineering change and /or processes shut down before this task is carried out. We believe, however, that the measures we have specified are adequate to reduce the overall risk to an acceptable level without further safeguards, and we recommended that work should proceed.
We are not satisfied with the safeguards available to control risk and we recommend that this task should not proceed until further risk control measure can be developed.

Conclusion/Comments: ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
Name: …………………………   Signature: ……………………..                                                                                                                                         Reviewed by HSE dept.
                                                                                                                                                                                                                                                   Name: ……………………….
P: probability   S: severity    R.V: Risk value                                                                                                                                                                           Signature: ……………………
R.V= S xP                                                                                                                                                                                                                                 Date: …………………………
                                                                                                             

ليست هناك تعليقات