اعلان 728 × 90

اخر الأخبار

Risk Assessment نموذج تقييم المخاطر


Risk Assessment

                                        Date :    /     /

 

Team Members


1.      
2.      
3.      
4.                                                                    

Subject: -


Step
What Can Go Wrong?

What Would Happen if it Did?

Risk Evaluation

What Can I Do to Prevent This?

Residual Risk

P
S
R.R
P
S
R.R
1
FALL OF THE CAR.
    ·  DAMAGE OF CAR.
    ·  ENJURY
H
H
13
    ·  DIRECT SUPERVISION
    ·  WATCHING PERSONNEL POSITION
    ·  USING PPE
L
L
2
2
Climbing up and down the plat form.
    ·  Injury or Fatality
L
H
10
    ·  Made small ladder to decrease height between the plat form and the ground.
L
L
2
3
Falling off the standing Plat form.
    ·  Injury or Fatality



Use full body harness at height >2 m



4
FALL OF THE EQUIP.
    ·  DAMAGE OF EQUIP.
    ·  ENJURY
H
H
13
    ·  CRANE AND SLINGS CHECKED CERTIFIED
    ·  DIRECT SUPERVISION
    ·  WATCHING PERSONNEL POSITION
    ·  USING PPE
L
L
2
5
FALL OF THE load.
    ·  DAMAGE OF EQUIP.
    ·  ENJURY
H
H
13
    ·  CRANE AND SLINGS CHECKED CERTIFIED
    ·  DIRECT SUPERVISION
    ·  WATCHING PERSONNEL POSITION
    ·  USING PPE
L
L
2
6
Emergency case during refilling.
    ·  DAMAGE OF EQUIP.
    ·  ENJURY
H
H
13
    ·  Isolate the refilling water valve.

L
L
2
7
Falling because of person diabetic coma
    ·  Injury or Fatality
L
H
10
    ·  Medical checking before work
L
L
2
8
PPE not used
Injury
L
H
10
PPE must put on in work site
L
L
2









ليست هناك تعليقات