Subject: - LOADING Kenwarth truck unit #  

Step
What Can Go Wrong?

What Would Happen if it Did?

Risk Evaluation

What Can I Do to Prevent This?

Residual Risk

P
S
R.R
P
S
R.R
1
FALL OF THE CAR.
     ·   DAMAGE OF CAR.
     ·   ENJURY
H
H
13
     ·   DIRECT SUPERVISION
     ·   WATCHING PERSONNEL POSITION
     ·   USING PPE
L
L
2
2
Climbing up and down for plat form.
     ·   Injury or Fatality
L
H
10
     ·   Made small ladder to decrease height between the plat form and the ground.
L
L
2
3
Falling off the standing Plat form.
     ·   Injury or Fatality
L
H
10
     ·   Using full body harness at height < 2 meter.  
L
L
2
4
FALLING LIFTING
-     INJURY
-     EQUIP. DAMAGE

H

H
13
-     PROPER PPE AND GOOD SUPERVISION.
-     CHEK LOOSE LIFTING MATERIALS BEFORE LOAD.
-     USE TAG ROPES
-     POSITION YOUR PEOPLE AWAY FROM THE LOAD MOVEMENT
-     DON’T STAND UNDER LOAD
L

L
2


    ·   



    ·   



 Remarks:-

Ø  P   = Probability    

Ø  S   = Severity     
Ø  R.R= Risk Rating

Team Members                                                 Risk Assessment                                                 Date   /    /

Date: 30/3/2003

    1.      Eng. Magdy Alam                 WD Maint. Ass. Gen. Mgr.
    2.      Eng.: Moh. Mostafa              Const. Div.
    3.      Eng. Mahmoud A/Halim        WD HSE
    4.      Eng.: Alaa A/Maksod            PETROJET
                                                                  

Subject: -   Installing and connected A/G Incinerator

Step
What Can Go Wrong?

What Would Happen if it Did?

Risk Evaluation

What Can I Do to Prevent This?

Residual Risk

P
S
R.R
P
S
R.R
1
















FALL OF THE EQUIP.
    ·  DAMAGE OF EQUIP.
    ·  ENJURY
H
H
13
    ·  CRANE AND SLINGS CHECKED CERTIFIED
    ·  DIRECT SUPERVISION
    ·  WATCHING PERSONNEL POSITION
    ·  USING PPE
L
L
2
 Remarks:-

Ø P   = Probability    

Ø S   = Severity     
R.R= Risk Rating

Team Members

1.   MR. AHMED EDREES                      WD S. Service DEPT. HEAD.
2.   Eng. ASHRAF MAH. A/AZIZ             WD HSE
3.   MR. HAMDY TAWFEK                     WD HSE
                                                                

Risk Assessment

 

Date 18/5/2003

Subject: - Installed pole at airport using crane

Step
What Can Go Wrong?

What Would Happen if it Did?

Risk Evaluation

What Can I Do to Prevent This?

Residual Risk

P
S
R.R
P
S
R.R
1
FALL OF THE pole.
    ·  DAMAGE OF EQUIP.
    ·  ENJURY
H
H
13
    ·  CRANE AND SLINGS CHECKED CERTIFIED
    ·  DIRECT SUPERVISION
    ·  WATCHING PERSONNEL POSITION
    ·  USING PPE
L
L
2
 Remarks:-

Ø P   = Probability     

Ø S   = Severity     

Ø R.R= Risk Rating










Team Members

4.   Eng. ASHRAF MAH. A/AZIZ             WD HSE
5.   MR. HAMDY TAWFEK                     WD HSE
6.   MR. MOHAMWED FATHY                WD HSE
                                                                 

Risk Assessment

 

Date 18/5/2003

Subject: - Drilling refilling breakage water using fire water pump 

Step
What Can Go Wrong?

What Would Happen if it Did?

Risk Evaluation

What Can I Do to Prevent This?

Residual Risk

P
S
R.R
P
S
R.R
1
Emergency case during refilling.
    ·  DAMAGE OF EQUIP.
    ·  ENJURY
H
H
13
    ·  Isolate the refilling water valve.

L
L
2
 Remarks:-

Ø P   = Probability    

Ø S   = Severity     
Ø R.R= Risk Rating






ليست هناك تعليقات